Party Wall
Do I Need A Party Wall Surveyor?
Put simply, if you are carrying out building work to your party wall or boundary you have a legal duty to serve the appropriate notices and repair any damages. In other words to act as a “good neighbour”.
This is a legal duty for a Building Owner. Failure to do so could result in an injunction being sought to stop the works.
Party Walls – How Can We Help You?
We can confirm whether or not the Act applies to your project.
Advise you about the correct notice to serve to make sure you comply with the Act
One of our professionally qualified Directors will work with you bringing over 20 + years experience
Clear, transparent fees, all agreed up front.
Easy to work with, no jargon here
When Does The Part Wall Act Apply?
If you carry out work to;
Building a new party wall on the boundary, or a wall adjacent to the boundary, on the Owner’s side.
Carrying out works to an existing party fence wall or party structure, including rebuilding a wall to a reduced height.
Building within three or six metres of the Adjoining Owner’s walls or buildings if the works involve excavation works.
Building or placing special foundations on the Adjoining Owner’s land.
Notice Requirements Under The Party Wall Act 1996
A building owner must give notice to all adjoining owners of any planned works.
The notice requirements will depend on the type of works that are to be undertaken.
There are 3 types of notices;
· Line of Junction
· Party Structure
· Notice of Adjacent Excavation
In many situations, more than one type of notice is required and it is essential that you ensure all notices required under the Act are served.
When Should A Party Wall Notice Be Served?
Party Wall Notices should be served at the earliest opportunity in order to ensure that there is sufficient time for the notice to run and for negotiations, if a dispute arises, to be undertaken. However notices are only valid for 12 months so caution should be given so as not to serve the notice too early either as they may then expire before works commence. This is not usually an issue with smaller domestic scenarios but should be factored into larger, longer term projects.
Party Structure Notices are required to be served at least two calendar months prior to the commencement of works
Line of Junction and Notice of Adjacent Excavation at least one calendar month prior to the commencement of works.
Click here to read about your duties under the Party Wall Act
Why Work With Us?
Expert Advice
With our 25 + years of experience of construction design, you can be reassured that you will receive expert, unbiased advice
Depth of Resource
There will always be someone at the end of a phone or email to answer your questions - we are not a one man band
In-House Expertise
You can trust us - as a local, established company, we have a proven track record - take a look at our testimonials!
Insurance
For your reassurance, we carry appropriate levels of Professional Indemnity Insurance
Peace of Mind
Est. in 1994 we have successfully helped 1,000’s of commercial building owners with their structural assessments and design work